Distribution Network Island Separation With Distributed Generation (DG) Based on Dynamic Planning
12042
全文录用
HE guang / State Grid Hebei Economic Research Institute
WANG ming / Shanghai University of Electric Power
DONG Xin / State Grid Hebei Electric Power Company
WANG Lei / Shanghai University of Electric Power
ZHAI xin / State Grid Hebei Economic Research Institute
XIE lin / State Grid Hebei Economic Research Institute
LIU Peng / State Grid Hebei Economic Research Institute
LIU Yong / Shanghai Proinvent Information Technology CO.,LTD,
DG islanding operation can improve the reliability of customers efficiently when the main power supply network has a fault.This paper establishes the weight model of islanding based on the concept of minimum spanning tree. Then the non-fault area is generated by the minimum tree to form a radial distribution network after the fault isolated. In the meantime separating the tree by dynamic planning according to the goal of the restoring load as much as possible.Finally,using IEEE distribution system with 118 nodes as an example to separate the island. The result shows that the method is reasonable and valid and the reliability is directly relate to the output of DG.
重要日期
  • 会议日期

    03月25日

    2017

    03月26日

    2017

  • 11月10日 2016

    初稿截稿日期

  • 11月20日 2016

    初稿录用通知日期

  • 11月30日 2016

    终稿截稿日期

  • 03月26日 2017

    注册截止日期

主办单位
IEEE Beijing Section
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询