The cement industry is one of the most important industries and higher consumption of thermal and electrical energy. Fushe-Kruja Cement Factory in Albania has an annual capacity of 1.3 million tons of cement and meet global standards for environmental protection. Achieving high process energy efficiency and ensuring high product quality are the main duties of the cost-effective cement production in Fushe Kruja factory.
Recently, as the cement demand rose, the factory has encountered with long-waiting lines at the loading facilities. The plant loading facilities are capable to serve pallet loading, bulk loading, and floor loading trucks. The paper is focused on pallet loading facility, as it is the easiest one to be modified. Thus, the goal is to redesign the loading facility and change the process so that overall waiting time in system is reduced. It will be shown that by modification of PLC programming of palletizing system can be increased the production capacity, using line automation flexibility without sacrificing quality, reduced the energy consumption and other costs and simplified the complexity of actual palletizing system. SIMATIC Manager Step 7 software is used for modification of PLC programing and PRO Tool software to program the SIEMENS control panels.
Two main factors are taking in consideration during the study: 1) time of production process, which is converted in palletizing system efficiency, and 2) cost of production. Proposed PLC programming modification will ensure maximum robustness and maximum operational reliability combined with excellent palletizing quality. This will benefit the company in increasing two times its palletizing system capacity, increasing resource utilization in distribution facility, reducing production costs and gaining customers’satisfaction.
重要日期
  • 会议日期

    03月25日

    2016

    03月26日

    2016

  • 10月27日 2015

    初稿截稿日期

  • 10月27日 2015

    提前注册日期

  • 12月22日 2015

    终稿截稿日期

  • 03月26日 2016

    注册截止日期

联系方式
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询