Electric Field Simulation of Line Jumping Process of UHV Tension Tower by Live Working
编号:453 访问权限:仅限参会人 更新:2022-09-22 10:48:25 浏览:146次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

视频 无权播放 演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
The squirrel-cage rigid jumper is used in UHV DC tensile tower, which is suspended by double V-type suspension string. In live working, workers usually enter the equipotential position from the tower body horizontally. In order to study the direction of entering, the electric field calculation was carried out. In the study, two paths were selected, including facing the large grading ring and keeping one meter off it when entering the equipotential position horizontally, and 20 points were selected in each path to calculate the electric field of the large grading ring and the worker’s body surface when the worker in each point selected before. According to the calculation results, basing the principle of low field strength and gentle change, keeping one meter off the large grading ring when entering the equipotential position horizontally from the tower body is recommended.
关键词
Electric Field Simulation,Tension Tower,live working,UHV DC transmission
报告人
Zhihui Qiu
North China Electric Power University

稿件作者
Yujian Ding China ELectric Power Research Insitute
Zhihui Qiu North China Electric Power University
Shengfu Wang Electric Power Research Institute of State Grid Qinghai Electric Power Company
Xiuyuan Yao China Electric Power Research Institute
Ling Jiang Electric Power Research Institute of State Grid Qinghai Electric Power Company
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    09月25日

    2022

    09月29日

    2022

  • 08月15日 2022

    提前注册日期

  • 09月10日 2022

    报告提交截止日期

  • 11月10日 2022

    注册截止日期

  • 11月30日 2022

    初稿截稿日期

  • 11月30日 2022

    终稿截稿日期

主办单位
IEEE DEIS
承办单位
Chongqing University
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询