摘要
The construction of urban shallow tunnels in silt stratum is a puzzle for engineering circles. The construction plan adopts comprehensive support system: high-pressure jet grouting pile, advanced small conduit and circumferential grouting. The well-point precipitation method and three-bench seven-step excavation method of shallow tunnel construction of the East Hudong Road Tunnel through the silt stratum in Fujian Province is carried out. In this paper, the tunnel construction method and in-situ monitoring tests are used to analyze the characteristics of the surface subsidence and the crown settlement. Meanwhile the reasonable allowance deformation is discussed in the city tunnel design in silt stratum.
关键词
CICTP
报告人
Siyue He
School of Highway, Chang'an University

稿件作者
Siyue He School of Highway, Chang'an University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询