Shield construction will cause ground disturbance, and then cause the settlement of surrounding ground and adjacent buildings, which brings great challenges to the stability of excavation face and the safety of surrounding buildings and facilities. The maximum ground settlement is related to the corresponding ground loss rate, and the ground settlement can be controlled by controlling the ground loss rate. However, in the actual engineering, we should not only pay attention to the ground settlement, but also pay attention to the deformation of the surrounding structures. Based on the background of Maglev crossing Shanghai Metro Line 13, PLAXIS 2D model is established to calculate the ground settlement and structure settlement under different ground loss rates. Combined with peck formula, the relationship between ground loss rate, ground settlement and pile foundation settlement is analyzed by comparing the modeling calculation results with the analytical results of the formula.
关键词
CICTP
报告人
Guoqiang Wang
Tongji University

稿件作者
Guoqiang Wang Tongji University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询