Reliability and Operational Impact of “CBTC + TBTC” Dual-signal Redundant Train Control System
编号:1978 访问权限:仅限参会人 更新:2021-12-03 14:43:58 浏览:134次 张贴报告

报告开始:2021年12月17日 08:46(Asia/Shanghai)

报告时间:1min

所在会场:[P2] Poster2021 [P2T1] Track 1 Advanced Transportation Information and Control Engineering

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
“CBTC (Communication Based Train Control) + TBTC (Track-circuit Based Train Control)” is a dual-signal redundant train control system with TBTC as the fallback mode, mainly implemented in the re-signaling program of the existing old TBTC line. This study uses reliability block diagrams to quantitatively analyze the reliability of the dual-signal system and the time-colored Petri net of degraded operation to calculate the delay time caused by signal equipment failure leading to mode transition. The above methods are applied to “CBTC + TBTC” re-signaling program of Shanghai Metro Line 2. The results show that the reliability of the new system is higher than that of the existing TBTC system and a single CBTC system, and the train delay caused by the fault leading to system fallback is minimized to 1 min. The analysis method also provides references for other multi-mode train control systems.
关键词
CICTP
报告人
Yu Liu
Tongji University

稿件作者
Yu Liu Tongji University
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询