Study on Minimum Clear Distance between Tunnel Exit and Expressway Mainline Toll Station
编号:1494 访问权限:仅限参会人 更新:2021-12-03 10:51:32 浏览:97次 张贴报告

报告开始:2021年12月17日 10:56(Asia/Shanghai)

报告时间:1min

所在会场:[P1] Poster2020 [P1T2] Track 2 Transportation Infrastructure Engineering

暂无文件

摘要
The mainline toll station and tunnel are the important parts of the expressway system. The rationality of the clear distance affects the traffic capacity and safety. Based on the characteristics and the implementation status of expressway construction, combined with the relevant standards and research results at home and abroad, the clear distance between tunnel exit and mainline toll station has been defined and divided into the light adaptation distance, the traffic signs recognition distance, the operation distance and the lane confirmation distance. On the basis of analysing various constraints, the research has been carried out to establish a calculation model for the clear distance between the tunnel exit and the mainline toll station. It is proposed that under the secondary service level of the 4-lane expressway, under the design speed of 120km/h, the general value of the clear distance between the tunnel exit and the mainline toll station should be greater than 750m; when it is limited by terrain and route corridors, the minimum clear distance should be no less than 600m. It provides a valuable reference for the design and management of tunnels and mainline toll stations.
关键词
CICTP
报告人
凯歌 杨
长安大学

稿件作者
凯歌 杨 长安大学
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询