Long-term Settlement of Four Overlapping Tunnels Subject to Repeated Train Loading
编号:1077 访问权限:仅限参会人 更新:2021-12-03 10:35:49 浏览:98次 张贴报告

报告开始:2021年12月17日 08:07(Asia/Shanghai)

报告时间:1min

所在会场:[P2] Poster2021 [P2T5] Track 5 Highway and Railway Engineering

演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
Long-term settlement of metro tunnels due to repeated train loading in a four overlapping tunnels case is investigated based on finite element method and empirical method, and the influence from the net distance and the train speed is discussed in detail. The results show: (1) Uneven settlement is observed on the tunnels with a maximum settlement occurring at the intersection of upper and lower tunnel axes. (2) The range of the settlement trough is within about 4 D (diameter of the tunnel) from the intersection points, beyond which dynamic amplification effect of the four tunnels is too small to cause uneven settlement. (3) The net distance of the upper and lower tunnels has a nonlinear effect on the uneven settlement that uneven settlement increases sharply with the decreasing of net distance. (4) However, the train speed has little influence on the uneven settlement within the common speed range in practical.
关键词
CICTP
报告人
Zhiyao Tian
Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Tongji University, Shanghai, 201804, China

稿件作者
Zhiyao Tian Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Tongji University, Shanghai, 201804, China
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    12月17日

    2021

    12月20日

    2021

  • 12月16日 2021

    报告提交截止日期

  • 12月24日 2021

    注册截止日期

主办单位
Chinese Overseas Transportation Association
Chang'an University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询