Review of the Development of Hubei Power Grid during the 13th Five-Year Plan Period and Prospect of the 14th Five-Year Plan
编号:60 访问权限:仅限参会人 更新:2022-05-16 09:23:25 浏览:193次 张贴报告

报告开始:暂无开始时间(Asia/Shanghai)

报告时间:暂无持续时间

所在会场:[暂无会议] [暂无会议段]

视频 无权播放 演示文件 附属文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
During the 14th Five-Year Plan period, Hubei Power Grid will inevitably face the changes and challenges that are brought by power system transformation. This paper introduces basic situation of Hubei Power Grid during the 13th Five-Year Plan period, such as social economy, power grid structure, installed power capacity, total electricity consumption and load, electricity demand, power grid equipment and line loss rate, analyzes critical influencing factors during the 14th Five-Year Plan period, and puts forward the trend of line loss rate of Hubei Power Grid during the 14th Five-Year Plan.
 
关键词
basic situation; Hubei Power Grid; the 13th Five-Year Plan; influencing factors; the 14th Five-Year Plan
报告人
WangWenna
国网湖北省电力有限公司电力科学研究院

发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    05月27日

    2022

    05月29日

    2022

  • 02月28日 2022

    初稿截稿日期

  • 05月29日 2022

    注册截止日期

  • 06月22日 2022

    报告提交截止日期

主办单位
IEEE Beijing Section
China Electrotechnical Society
Southeast University
协办单位
IEEE Industry Applications Society
IEEE Nanjing Section
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询