Maximum output cleaning-cycle optimization at a 20 MW solar-power plant
            
                编号:264
                访问权限:仅限参会人
                                    更新:2022-04-19 18:29:37                浏览:621次
                口头报告
            
            
            
                摘要
                In recent years, photovoltaic (PV)- power plant has increased markedly. The dust-caused loss of a 20 MW(p) PV power plant, located in the Baicheng area, was analyzed. The power generation data show that dust-caused power-loss has a linear dependency with dust deposition. A cleanliness management model is used to find the optimal cleaning-cycle to produce maximum output-power. The results show that, when the average light intensity is 260W/m2, the 500kW array produces the maximum economic output per unit time, using mechanical cleaning and a cleaning cycle of 2.9 d, so as the 20 MW(p) PV power plant. For a 20MW solar PV power plant, the yearly income can increase RMB 1.32 million by selecting the optimized cleaning cycle.
             
            
                关键词
                PV modules, dust deposition, maximum output cleaning -cycle, economic analysis
             
            
            
                    稿件作者
                    
                        
                                    
                                                                                                                        
                                    宏伟 曲
                                    东北电力大学
                                
                                    
                                                                                                                        
                                    庆禄 孔
                                    东北电力大学
                                
                                    
                                        
                                                                            
                                    志明 徐
                                    东北电力大学
                                
                                    
                                                                                                                        
                                    虎 王
                                    中国大唐集团科学技术研究院有限公司
                                
                                             
                          
    
发表评论