743 / 2019-04-26 15:36:23
Optimal Arrester Configuration Scheme for Series Compensation Devices
Arrester configuration,large-capacity hybrid unified power flow controller,Series Compensation,thyristor bypass switch
全文录用
Ge Jing / Global Energy Interconnection Researching Institute Co. ,Ltd.
Liu Haijun / Global Energy Interconnection Researching Institute Co. ,Ltd.
Zhang Yifan / North China Electric Power University
Song Jieying / Global Energy Interconnection Researching Institute Co. ,Ltd.
Zhao Guoliang / Global Energy Interconnection Researching Institute Co. ,Ltd.
When the grounding fault occurs at the network side of the series compensation device, there will be a large temporary overvoltage between the terminals. Based on the analysis of overvoltage, the thyristor bypass switch (TBS) with microsecond hardware is used to transfer the fault current through the device rapidly, which makes the arrester produce instantaneous impulse residual voltage only at the natural commutation point, effectively reduces the voltage ratio of the arrester, and then the optimal configuration scheme of the arrester with series compensation device is put forward. Taking the large capacity hybrid unified power flow controller as an example, the basic parameters of arrester are determined by RTDS transient simulation calculation, and the voltage of each measuring point before and after arrester configuration is compared and analyzed through simulation model checking, so as to determine the rationality of arrester configuration.
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询