1111 / 2019-05-20 21:36:12
Active Distribution Network Risk Assessment with Credibility
Active distribution network,Credibility,Risk assessment,Uncertainty factor
全文录用
The penetration rate of distributed generation in distribution networks is getting higher and higher, the trend is bidirectional, and the management mode is active, which make the structure of active distribution network is more complicated and the uncertainty factor increases. The randomness of Monte Carlo sampling also reduces the accuracy of the results. This paper considers the uncertainty of the evaluation results and the uncertainty of power supply and load sampling, and establishes a model to propose a risk assessment method for active distribution network considering credibility. This paper evaluates the operational risk of the actual distribution network in a certain area of Jiangsu Province, compares the real-time credibility and the set credibility, and judges whether the risk assessment result of the distribution network tends to converge. The results show that the reliability and accuracy of the active distribution network risk assessment method with credibility are greatly improved.
重要日期
  • 会议日期

    10月21日

    2019

    10月24日

    2019

  • 10月13日 2019

    摘要录用通知日期

  • 10月13日 2019

    初稿截稿日期

  • 10月14日 2019

    初稿录用通知日期

  • 10月24日 2019

    注册截止日期

  • 10月29日 2019

    终稿截稿日期

承办单位
Xi'an Jiaotong University
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询