Peak Load Regulating Capability Analysis of LP Turbine Outage Scheme for Cogeneration Units Flexibility Upgrading
Cogeneration Unit; Peak Load; Regulating Capability; Analysis; LP Turbine Outage upgrading scheme.
摘要录用
With the increasing pressure of the strengthening the peak load regulating capability of the cogeneration units in North China, various flexibility upgrading schemes are suggested for the existing cogeneration units. Among these LP Turbine Outage Upgrading Scheme is one of the most attractive schemes and has won great attention from the utility users. The objectives of the study in this paper including: (1). to analyze the performance improvement attained by the proposed LP Turbine Outage Upgrading Scheme; (2). to analyze the economic cost and benefit achieved compared with the original unit by the proposed method.
Detailed information is described for the function and configuration of the proposed scheme, including the advantages and disadvantages of the system. Model-based software is utilized for the simulation of the one 300MW subcritical cogeneration unit performance and its LP Turbine Upgrading Scheme performance, and detailed comparison is made for the performance improvement accomplished. Based on the models simulation results, the unit performance improvement especially the unit load regulating capability under various heating load conditions is studied.
It is shown from the calculation results that under same steam inlet flow condition, the maximum heating steam supply capacity is increased by around 100t/h and unit power output is decreased by 14-15MW from the adopted upgrading scheme, therefore under the LP Turbine Outage operation mode, the cogeneration unit has significantly increased heating supply capacity compared with the original unit. Further analysis indicates that under same heating steam supply conditions, compared with the original cogeneration unit the unit minimum power output can be decreased by around 56MW using the upgrading scheme. However, the disadvantage of operating as a backpressure generation unit under LP Turbine Outage operation mode makes the unit impossible to adapt to external power demand. In addition, in spite of the lower power output and more economical heat rate under same heating steam supply condition, the total economic benefit of the cogeneration unit is less profitable in upgrading scheme operation than in original scheme based on the calculation results, which will significantly influence the decision-making of application of the LP Turbine Outage upgrading scheme.
重要日期
  • 会议日期

    10月21日

    2019

    10月25日

    2019

  • 10月20日 2019

    初稿截稿日期

  • 10月25日 2019

    注册截止日期

承办单位
浙江大学
昆明理工大学
联系方式
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询