165 / 2013-05-06 16:43:18
Numerical Study On The Initial Pumping Process Of The Cable-in-ct Installation
Coiled Tubing, Cable, Pumping, Installation
全文待审
Inject cable into Coiled Tubing is an important guarantee of the oilfield smart job to supply electrical power and signals down hole to collect and manipulate the real time data. Pumping fluid to inject cable into a reel of CT is a new method for the installation. While pump-in, cable was floated under the drag force on its surface in the turbulent fluid. Here how to realize the injection in the initial segment is crucial to the whole installation process. After a brief introduction of the pumping method and device for the installation, the main work focused on the initial injecting process. This paper modeled the initial injecting segment in the horizontal status, simulated the pumping process by finite element software and then derived the data from the post processing software to analyze the process. Besides, it also carefully analyzed the effect of the different flow velocities in the annulus and the total force on cable. After the numerical study, the related parameters and functions for the injecting operation like pumping rate and working pressure were obtained. The theoretical analysis and analog results verified the feasibility of the pumping method for the cable-in-CT system. When compared with other conventional ways, injecting cable by pumping fluid is more economic and more adaptable in oil field operation, especially in operations on offshore platform.
重要日期
  • 会议日期

    10月16日

    2013

    10月18日

    2013

  • 05月01日 2015

    初稿截稿日期

  • 05月01日 2015

    提前注册日期

  • 05月15日 2015

    报告提交截止日期

  • 06月09日 2015

    注册截止日期

主办单位
美国土木工程师学会
历届会议
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询